Improvement #31185
openMaking all Modules in single project, with simple folder listing for each modules
Added by Rohith P K 4 months ago. Updated 3 months ago.
100%
Description
Making all Modules in single project, with simple folder listing for each modules
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/17/2025 to 12/12/2025
- Status changed from Assigned to In Progress
- % Done changed from 0 to 70
Completed the implementation of flight, hotel, home screen and my booking initially
In progress of error fixing process
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/12/2025 to 12/15/2025
Updated by John Pius Thayiparampil 4 months ago
Implemented static package and my booking and completed flight, hotel packages with home and authentication part
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/15/2025 to 12/16/2025
- Start date changed from 12/12/2025 to 12/16/2025
Updated by John Pius Thayiparampil 4 months ago
Completed the fixed package and static package, now initialized the car rental module
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/16/2025 to 12/17/2025
Updated by John Pius Thayiparampil 4 months ago
Car rental module got finished, but not verified because of no result, completed the activity module also facing same issue no result on all possible scenario, also tries to rectify the issues in activity screen.
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/17/2025 to 12/18/2025
- Start date changed from 12/16/2025 to 12/18/2025
Updated by John Pius Thayiparampil 4 months ago
Activity module got finished and verified, static package got verified, initialized transfer module
Updated by John Pius Thayiparampil 4 months ago
- % Done changed from 70 to 80
Transfer module got finished, error correction is needed, started the car rent initialization
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/18/2025 to 12/22/2025
- Start date changed from 12/18/2025 to 12/19/2025
Updated by John Pius Thayiparampil 4 months ago
Completed transfer module, rectified all errors, completed car rental
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/22/2025 to 12/24/2025
Updated by John Pius Thayiparampil 4 months ago
Car rental issue fixed, initialized insurance module
Updated by John Pius Thayiparampil 4 months ago
Working on the insurance and train module
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/24/2025 to 12/29/2025
Updated by John Pius Thayiparampil 4 months ago
- % Done changed from 80 to 90
Completed insurance and train and initialized flight plus hotel module.
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/29/2025 to 12/30/2025
Updated by John Pius Thayiparampil 4 months ago
all the code conflict issue fixed , flight + hotel configured
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/30/2025 to 12/31/2025
Updated by John Pius Thayiparampil 4 months ago
Completed dynamic package and in progress on flight + hotel
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 12/31/2025 to 01/01/2026
Updated by John Pius Thayiparampil 4 months ago
Dynamic package all issues resolved and unit testing completed, setting up the flight + hotel without combinational feature
Updated by John Pius Thayiparampil 4 months ago
- Due date changed from 01/01/2026 to 01/02/2026
Updated by John Pius Thayiparampil 3 months ago
In progress - flight plus hotel, avoiding the combinational feature from the module and tries to restructure the code of the flight plus hotel module.
Updated by John Pius Thayiparampil 3 months ago
- Due date changed from 01/02/2026 to 01/05/2026
Updated by John Pius Thayiparampil 3 months ago
Completed the controller phase modification and restructuring until pax page need to update the pax page because of the current flow
Updated by John Pius Thayiparampil 3 months ago
- Due date changed from 01/05/2026 to 01/06/2026
Updated by John Pius Thayiparampil 3 months ago
Modifying the flight plus hotel module by masking the combinational features
Updated by John Pius Thayiparampil 3 months ago
- Due date changed from 01/06/2026 to 01/12/2026
Updated by John Pius Thayiparampil 3 months ago
Working on flight plus hotel, made a combination handling on the based on the search call and combined flight hotel for the fph ,
Updated by John Pius Thayiparampil 3 months ago
- Due date changed from 01/12/2026 to 01/13/2026
Updated by John Pius Thayiparampil 3 months ago
Completed the flight + hotel module configuration, facing some bug, trying to make it fixed
Updated by John Pius Thayiparampil 3 months ago
- Due date changed from 01/13/2026 to 01/14/2026
Updated by John Pius Thayiparampil 3 months ago
Completed the full configuration of the flight plus hotel module, implementing all necessary components for a complete package booking system. I set up the controller within MultiProvider for proper state management, configured the navigation routes for smooth user flow, and resolved all model import issues to ensure clean code architecture. This creates a fully integrated system where users can seamlessly search, view, and book combined flight and hotel packages.
Currently, unit testing going on
Updated by John Pius Thayiparampil 3 months ago
- Due date changed from 01/14/2026 to 01/15/2026
Updated by John Pius Thayiparampil 3 months ago
- Status changed from In Progress to Fixed not Tested
- % Done changed from 90 to 100
Completed flight plus hotel unit testing and integration, resolved the issues like not reflecting selected source and destination, travel date etc, resolved the issues in the flight plus hotel search page, result in hotel and flight both, issue fixed with loyalty controller, sorted by configuring the loyalty controller into the app fixed issues.